Location: Texas
Duration: 16 months
Manpower: average 44 combined on both sites
On-site assembly and installation of more than 1800 metric tons of steel structure, equipment, ductwork ( carbon and stainless steel ). Part of the project was process piping installation (natural gas, hydraulic, compressed air, cooling air). MZP was responsible for hydroflush and pressure testing of the hydraulic system. MZP crew also installed baghouse filter with id fan and silencer. Thermal insulation and metal cladding was supplied and installed by MZP also.